Combined Footing Calculator
Free combined footing calculator — calculate combined footing concrete with rebar grids, count and cost. Includes live results, step-by-step working, charts, material takeoff and cost estimates. No sign-up.
Calculator
Grid each way
Over-excavation and spillage
Blank to skip
Footing plan
| Item | Amount |
|---|---|
| ConcreteAll pads + waste | 3.804 cu yd |
| Each padSingle pad | 1.778 cu yd |
| Rebar grid152 ft | 102 lb |
How to use this result
- Primary result: 3.80 cu yd — verify it against a rough hand check before ordering.
- Read the steps section to see every conversion and the exact formula path.
- Use the breakdown table on the left as your order or bid checklist.
- Re-run with worst-case dimensions so the plan covers the whole job.
Results
Concrete to order
3.804cu yd
All pads + waste
1.778cu yd
Single pad volume
102lb
152 ft total
Live results update as you type — currently showing 3.80 cu yd. Replace the defaults with your own measurements for exact results.
Visualizations
Order vs one pad (cu yd)
Net vs waste
Formula
Pad footing concrete is single-pad volume times count, with a rebar grid each way.
Variables
| Symbol | Name | Unit | Description |
|---|---|---|---|
| n | Count | pads | Number of pads. |
| L, W, D | Pad size | ft | Depth converts from inches. |
| grid | Steel | ft | Bars each way at spacing. |
Explanation
Single pad at full precision times count; grid bars count from spacing; waste gives the order.
Step-by-Step Calculation
Follow each step to understand how the result is calculated from your inputs.
One pad in cubic yards.
Grid steel at 12 in centers each way.
Total with 7% waste.
Worked Examples
See how the calculator works with different scenarios.
Scenario
The calculation run on the values above, showing the full path rather than only the answer.
Inputs
Calculation
1. One pad in cubic yards. → Each = 1.778 cu yd 2. Grid steel at 12 in centers each way. → 152 ft rebar 3. Total with 7% waste. → Order = 3.804 cu yd
Result
3.80 cu yd
Interpretation
Confirm bearing soil and frost depth, hold inspections before pouring, and keep 5–10% concrete waste in every order.
Understanding Your Result
Your Result: Concrete to order: 3.804 cu yd
Typical range: Strip footing ~1–2 cu yd per 10 ft · pier 12 in × 4 ft ~0.13 cu yd · basement wall 40 ft ~10 cu yd.
What This Means
Your result is 3.80 cu yd — the concrete, excavation, rebar and cost for your combined footing
Why It Matters
Foundations carry everything and forgive nothing: undersized footings settle, missing rebar cracks, and wet concrete waits for no one. Quantities first keeps the pour boring.
Professional Interpretation
Confirm bearing soil and frost depth, hold inspections before pouring, and keep 5–10% concrete waste in every order.
How this is calculated
Volume is count × length × width × depth-in-feet ÷ 27. Waste and rounding apply last.
What drives the result
The inputs in a single consistent unit and the allowance or price you apply.
Recommendations
- •Verify critical dimensions on site before ordering.
- •Keep one unit throughout each calculation.
- •Add the trade allowance before buying, not after.
- •Attach the step-by-step working to bids and records.
Educational Content
Introduction
Foundation quantity is geometry: lengths × cross-sections for concrete, perimeter × depth for excavation, bar counts × lengths for rebar.
Concept Explanation
Volume is count × length × width × depth-in-feet ÷ 27. Waste and rounding apply last.
Applications
Benefits
- •Concrete, dig, steel and cost from one input set
- •Inspection-ready step-by-step working
- •Waste and rounding built into order rows
- •Free, no sign-up, works on site from a phone
Limitations
- •Two-dimensional math unless stated otherwise — slopes and curves need the right tool
- •Results are only as good as the site measurements
- •Allowances and prices are estimates — confirm with local quotes
Best Practices
- •Measure twice and write measurements down before typing them in
- •Keep one unit throughout each calculation
- •Photograph the tape on large or disputed measurements
- •Re-run with worst-case numbers so the plan covers the whole job
Common Misconceptions
Practical Tips
- •Enter full measurements and let the tool round at the end.
- •Use the steps section to double-check the formula path.
- •Save or share the result link with the crew and the supplier.
- •Re-run with worst-case dimensions for a safe order.
Common Mistakes
Assumptions
This calculator makes the following assumptions to provide estimates:
Limitations
Be aware of these limitations when using this calculator:
Frequently Asked Questions
Answers to common questions about this calculator.
How do I calculate concrete for a combined footing?
When are pad footings used?
How accurate is this calculator?
What does the cost estimate include?
Do I need an engineer?
When can footings be poured?
How wide and deep should a footing be?
How do footings reach below frost?
How much rebar goes in a footing?
How do I lap and corner rebar?
What concrete strength for footings?
How much digging is a footing really?
What is undisturbed bearing soil?
Do footings need formwork both sides?
How do piers differ from pad footings?
What is a grade beam vs a strip footing?
How do I keep a footing pour continuous?
Why is my result different from my supplier quote?
Do I need a professional for this work?
How do I convert the result to other units?
What mistakes do beginners make with the combined footing calculator?
Can I share the combined footing calculator result with my crew or supplier?
Does the combined footing calculator work on a phone at the job site?
How often should I re-run the combined footing calculator?
What should I check before ordering materials?
Where do I find the formula behind the combined footing calculator?
How do I read the steps section on the combined footing calculator page?
What if my site conditions differ from the page defaults?
How do I budget for price changes mid-project?
Should I buy materials in bulk for this job?
Related Calculators
Explore more calculators related to this topic.
Related Guides
Deepen your understanding with these educational resources.
Sizing footings, rebar minimums, and inspection hold points.
Step-by-step combined footing calculator examples with real job-site numbers.
Reference tables, waste factors and coverage rates for foundations & footings.
Glossary
Technical terms used in mortgage calculations explained in plain language.
- Footing
- Widened base that spreads wall or column loads to the soil.
- Bearing capacity
- Soil pressure limit, e.g. 1,500–4,000 psf for typical soils.
- Rebar
- Deformed steel bars; #4 is 1/2 in, #5 is 5/8 in diameter.
- Frost line
- Depth below which soil does not freeze — footings must bear below it.
- Backfill
- Soil replaced around the foundation after inspection.
- Waterproofing
- Membrane or coating keeping foundation walls dry.
- cu yd
- The primary unit reported by this calculator.
Authoritative References
Trusted sources and standards referenced by this calculator.
Applicable Standards
Was This Calculator Helpful?
Page Information
2026-09-23
2.0.0
Free to use for educational and professional purposes.