Concrete Footing Calculator
Free concrete footing calculator — calculate footing concrete volume with waste, bag counts, truckloads and cost. Includes live results, step-by-step working, charts, material takeoff and cost estimates. No sign-up.
Calculator
Total run length
Cross-section width
Cross-section depth
Over-excavation and spillage
Ready-mix or bag rate
Pour plan
| Item | Amount |
|---|---|
| Net volumeCalculated | 2.222 cu yd |
| Order volumeNet + waste — order this | 2.378 cu yd |
| BagsRounded up | 107 bags |
| TrucksAt 10 cu yd each | 1 |
How to use this result
- Primary result: 2.38 cu yd — verify it against a rough hand check before ordering.
- Read the steps section to see every conversion and the exact formula path.
- Use the breakdown table on the left as your order or bid checklist.
- Re-run with worst-case dimensions so the plan covers the whole job.
Results
Order volume
2.378cu yd
Net plus waste — order this
107bags
Rounded up, selected size
1loads
At 10 cu yd per truck
60.0cu ft
Before waste
Live results update as you type — currently showing 2.38 cu yd. Replace the defaults with your own measurements for exact results.
Visualizations
Order vs truck capacity (cu yd)
Net volume vs waste
Formula
Linear concrete volume is run length times cross-section in feet, divided by 27.
Variables
| Symbol | Name | Unit | Description |
|---|---|---|---|
| V | Volume | cu yd | Order unit. |
| L | Length | ft | Total run. |
| W, D | Width, depth | in | Converted to feet (÷ 12). |
Explanation
Cross-section converts to feet, multiplies by the run, divides by 27, then waste, bags and trucks follow.
Step-by-Step Calculation
Follow each step to understand how the result is calculated from your inputs.
Convert the cross-section to feet.
Multiply out and divide by 27.
Add 7% waste.
Worked Examples
See how the calculator works with different scenarios.
Scenario
The calculation run on the values above, showing the full path rather than only the answer.
Inputs
Calculation
1. Convert the cross-section to feet. → 40.00 × 1.50 × 1.00 ft 2. Multiply out and divide by 27. → V = 2.222 cu yd 3. Add 7% waste. → Order = 2.378 cu yd
Result
2.38 cu yd
Interpretation
Round up to whole bags and half trucks, keep 5–10% waste in the order, and confirm subgrade depth with probes before scheduling.
Understanding Your Result
Your Result: Order volume: 2.378 cu yd
Typical range: Sidewalk square ~9 cu ft · patio 12×12×4 in ~1.8 cu yd · driveway 20×12×4 in ~3 cu yd · truck ~10 cu yd.
What This Means
Your result is 2.38 cu yd — the order volume, bag count, truckloads and cost for your footing
Why It Matters
Concrete is unforgiving: short loads stop pours, long loads waste money, and weak mixes fail inspections. Modelling volume, bags and cost first is the cheapest insurance on the job.
Professional Interpretation
Round up to whole bags and half trucks, keep 5–10% waste in the order, and confirm subgrade depth with probes before scheduling.
How this is calculated
Volume is run length × width-in-feet × depth-in-feet, divided by 27 for cubic yards. Waste multiplies last; bags round up; trucks round up to whole loads.
What drives the result
The inputs in a single consistent unit and the allowance or price you apply.
Recommendations
- •Verify critical dimensions on site before ordering.
- •Keep one unit throughout each calculation.
- •Add the trade allowance before buying, not after.
- •Attach the step-by-step working to bids and records.
Educational Content
Introduction
Concrete quantity is volume: length × width × thickness, converted to cubic yards for ordering. Bags, trucks and cost all divide from the same order volume.
Concept Explanation
Volume is run length × width-in-feet × depth-in-feet, divided by 27 for cubic yards. Waste multiplies last; bags round up; trucks round up to whole loads.
Applications
Benefits
- •One live number for volume, bags, trucks and cost
- •Waste allowance built into every order row
- •Steps show the exact formula path for records
- •Free, no sign-up, works on site from a phone
Limitations
- •Two-dimensional math unless stated otherwise — slopes and curves need the right tool
- •Results are only as good as the site measurements
- •Allowances and prices are estimates — confirm with local quotes
Best Practices
- •Measure twice and write measurements down before typing them in
- •Keep one unit throughout each calculation
- •Photograph the tape on large or disputed measurements
- •Re-run with worst-case numbers so the plan covers the whole job
Common Misconceptions
Practical Tips
- •Enter full measurements and let the tool round at the end.
- •Use the steps section to double-check the formula path.
- •Save or share the result link with the crew and the supplier.
- •Re-run with worst-case dimensions for a safe order.
Common Mistakes
Assumptions
This calculator makes the following assumptions to provide estimates:
Limitations
Be aware of these limitations when using this calculator:
Frequently Asked Questions
Answers to common questions about this calculator.
How do I calculate concrete for a footing?
How wide and deep should a footing be?
How many bags of concrete do I need?
How many cubic yards in a concrete truck?
Should I add waste to concrete orders?
How accurate is this calculator?
What does the cost estimate include?
When should I use ready-mix instead of bags?
How many 80 lb bags are in a cubic yard?
How thick should my slab be?
How much does ready-mix cost per yard?
What is a short-load fee?
How do I prepare the subgrade before a pour?
How far apart do control joints go?
When can I drive on new concrete?
What causes concrete cracks?
Should I order in the morning or afternoon?
Pump, chute or buggy — how do I place it?
How do I estimate labor for placing and finishing?
What strength concrete should I order?
What if my site conditions differ from the page defaults?
How do I budget for price changes mid-project?
Should I buy materials in bulk for this job?
How do I document quantities for change orders?
What inspections relate to the concrete footing calculator?
How do I measure correctly for the concrete footing calculator?
What units does the concrete footing calculator use?
How accurate is the concrete footing calculator?
Can I use the concrete footing calculator for bids and quotes?
Should I add waste or contingency to the result?
Related Calculators
Explore more calculators related to this topic.
Related Guides
Deepen your understanding with these educational resources.
How to size a pour, add waste, and schedule trucks.
Step-by-step concrete footing calculator examples with real job-site numbers.
Reference tables, waste factors and coverage rates for concrete & cement.
Glossary
Technical terms used in mortgage calculations explained in plain language.
- Cubic yard (cu yd)
- 27 cu ft — the unit ready-mix is sold in. A full truck carries about 10 cu yd.
- Bag yield
- Finished concrete per bag: 0.60 cu ft (80 lb), 0.45 (60 lb), 0.375 (50 lb), 0.30 (40 lb).
- Waste factor
- Extra 5–10% for form bulge, spillage and uneven subgrade.
- Slump
- Inches a fresh cone settles — the field measure of workability.
- Water-cement ratio
- Water weight ÷ cement weight; lower is stronger (≈0.40–0.60).
- Cure
- Keeping concrete moist and warm so hydration completes — 7 days typical.
- cu yd
- The primary unit reported by this calculator.
Authoritative References
Trusted sources and standards referenced by this calculator.
Applicable Standards
Was This Calculator Helpful?
Page Information
2026-09-23
2.0.0
Free to use for educational and professional purposes.