Calculator

Civil & Structural Engineering batter slopes · m3

Excavation Volume Calculator

28 September 2026 11 min read

Pit volume for footings and basements with battered side slopes.

Cut volume
198.7 m3
top 12.0 x 10.0 m

Live statistics

Cut volume

198.7 m3

Top size

12.0 x 10.0 m

Vertical cut

160.0 m3

Unit system
Base length L(m) Help
m

Pit base length.

Base width W(m) Help
m

Pit base width.

Depth D(m) Help
m

Cut depth.

Side slope s (H per V)(ratio) Help
ratio

0 vertical, 0.5 to 1.5 battered.

Results update live as you type

How you compare — standard sections

SectionDepth (mm)Mass (kg/m)A (cm²)Iₓ (×10⁶ mm⁴)Sₓ (×10³ mm³)
UB 305×165×40 · Steel I-beam 30440.351.385560
UB 457×191×67 · Steel I-beam 45467.185.52941290
UC 254×254×73 · Steel column 25473.193.1114895
RC 300×500 (C30) · Concrete beam 5003751500312512500
Glulam 140×450 · Timber beam 4502963010634725
SHS 200×200×8 · Hollow section 20047.460.436.9369

Indicative values for scheme design only. Always verify against the manufacturer / code tables (AISC Steel Manual, SCI Blue Book, ACI detailing) before ordering steel or pouring concrete.

Plans & details

Measure

Takeoff markup

Measure net from drawings, deduct openings, then apply waste per material class.

Check

Pour and delivery check

Reconcile ordered vs placed vs returns every pour to tighten rates.

Cost

BOQ build-up

Quantity times all-in rate per line, plus labour and contingency to total.

Typical details for scheme design. Replace placeholders with project drawings (1200×630 JPG or SVG line work in /public/plans/civil/). Do not scale from web images — use figured dimensions.

Design verification checklist

Work through before issuing results — 1/6 verified (17%).

Results

Optimal

Excavation volume

198.7m3

Truncated pyramid with battered sides.

Top area

120.0m2

Base expanded by slope on all sides.

Vertical-sided volume

160.0m3

Reference volume with zero slope.

Visualizations

Results Overview

198.7m3Excavation volume
120m3Top area
160m3Vertical-sided volume

Formula

Battered sides widen the pit with depth; the prismoidal (truncated pyramid) formula blends base and top areas into the true cut volume.

A,bot = LxW | L,top = L + 2sD | V = D/3 x (A,bot + A,top + sqrt(A,bot x A,top))

Alternative Form

s = 0 gives the vertical box V = LxWxD

Variables

SymbolNameUnitDescription
VCut volumem3Soil to excavate and haul or stockpile.
sSide slopeH/VHorizontal batter per unit vertical depth.
A,topTop aream2Daylight footprint of the battered pit.

Explanation

Truncated pyramid blending base and daylight areas.

Derivation

Volume of a truncated pyramid from base and daylight areas with the geometric-mean middle term.

Step-by-Step Calculation

Follow each step to understand how the result is calculated from your inputs.

Step 1

Enter base size, depth and side slope

Result: Pit fixed
Step 2

Read top size and areas

Result: Footprint issued
Step 3

Read cut volume

Result: Cut issued
Final Answer
198.7

Worked Examples

See how the calculator works with different scenarios.

Scenario

Basement pit in firm ground.

Inputs

L:10
W:8
D:2
slope:0.5

Calculation

Base is 80 m2. Top is 12 x 10 = 120 m2. V is 2/3 x (80 + 120 + 98.0) = 198.7 m3 against 160 m3 vertical.

Result

Cut = 198.7 m3

Interpretation

Slopes add 38.7 m3; add working space and overbreak next.

Understanding Your Result

Your Result: Excavation volume = 198.7 m3 · Top area = 120.0 m2 · Vertical-sided volume = 160.0 m3

Typical range: Battered pits run 15 to 40% above the vertical box.

What This Means

Bank cubic metres the excavator must dig.

Why It Matters

Cut volume drives plant hours, tip fees and programme days.

Professional Interpretation

Record base size, slope basis and whether working space is in.

Recommendations

  • •Deduct openings before applying waste
  • •Reconcile ordered vs placed every pour
  • •Keep service paperwork: batch tickets and tip slips

Learn — structural behaviour, deeply

Pit size in, dig volume out.

1 · The two equations that run every site

ΣF_y = 0

Vertical balance

Upward reactions must equal total downward load. Missing 1 kN here means a 1 kN shear error everywhere downstream.

ΣM = 0

Moment balance

Moments about ANY point must cancel. Take moments about one support to eliminate it and solve the other directly.

ΣF_x = 0

Horizontal balance

Zero for vertical-only loading — but the pin still needs checking once wind, soil or inclined loads appear.

Worked derivation (simply supported, point load): ΣMleft = 0 ⇒ Rb·L − P·a = 0 ⇒ Rb = P·a/L, then ΣFy = 0 ⇒ Ra = P − Rb = P·(L−a)/L. UDL adds w·L/2 per side acting at midspan. That is the entire calculation — everything else is bookkeeping.

2 · Support types — what each one can (and cannot) do

SupportReactionsAllowsWatch out
Roller1 (vertical)Horizontal slide + rotationProvides NO lateral restraint — pair with a pin or bracing.
Pin / hinge2 (vertical + horizontal)Rotation onlyMoment released here — detail the hinge, never weld it rigid by accident.
Fixed / clamped3 (+ moment)Nothing (fully restrained)Attracts large moments; settlement or temperature causes locked-in stress.
Propped cantilever3 (indeterminate ×1)Rotation at propNeeds compatibility (deflection = 0 at prop) — equilibrium alone is not enough.
Continuous (3+ supports)4+ (indeterminate)Rotation over interior piersSolve by superposition / moment distribution / software; reactions shift with stiffness.

3 · Factor-impact table — what moves your reactions most

FactorTypical impactWhy
Load position (a/L)Linear, dominantMoving P toward a support shifts ~100% of P onto it. Ra = P·(L−a)/L — position matters more than span.
UDL intensity (w)∝ w·L totalEach extra 1 kN/m on a 6 m beam adds 3 kN per reaction. Self-weight alone is often 1–5 kN/m on concrete.
Span length (L)∝ L for UDLDoubling L doubles UDL reactions and quadruples UDL moment (wL²/8). Keep spans tight where possible.
Overhang length (c)∝ c/L upliftUplift at the far support = P·c/L. A 2 m overhang with 10 kN on a 5 m span pulls down 4 kN — needs hold-down.
Fixity (pinned → fixed)Redistributes ~10–30%Fixed ends attract moment and shed midspan moment. Never assume fixity you have not detailed.
Support settlement (Δ)0 (det.) / large (indet.)Determinate beams just rotate; continuous/fixed beams develop locked-in moments ≈ 3EIΔ/L².
Dynamic / impact+10–100%Static reactions must be amplified for cranes, machinery, footfall (see ASCE 7 Ch. 4, AISC DG11).
Load combination× 1.2–1.6 (LRFD)1.2D + 1.6L + 0.5(Lr/S/R) governs most beams. Reactions for strength ≠ reactions for service checks.

4 · Code provisions you must cite on drawings

  • ASCE 7 load combinations (LRFD): 1.4D · 1.2D + 1.6L + 0.5(Lr/S/R) · 1.2D + 1.0W + 1.0L … Strength reactions use factored loads; bearing/deflection checks use service (unfactored) loads.
  • ACI 318 (concrete): strength-reduction ϕ = 0.65–0.90; development/lap lengths Ch. 25; one-way shear + punching Ch. 22. Reactions feed directly into Vu ≤ ϕVn.
  • AISC 360 (steel): Ch. F/G/H for moment/shear/combined; bearing at supports per J7–J8; bracing per App. 6. Connection must develop the computed reaction — a beam is only as strong as its seat.
  • Eurocode basis (EN 1990): ULS 1.35G + 1.5Q; SLS G + Q (characteristic). National annexes adjust factors — confirm the project annex.
  • Serviceability (all codes): live-load deflection ≈ L/360 floors, L/240 roofs; total ≈ L/240. Vibration: AISC DG11 / SCI P354 for rhythmic or office floors.

5 · Pro workflow (5 minutes per beam)

  1. Sketch the free-body diagram: every load incl. self-weight, every support, dimensions.
  2. Solve ΣM then ΣF — write both lines on the calc sheet so a checker can follow.
  3. Verify: re-take moments about the OTHER support; residual must be ≈ 0.
  4. Draw shear then moment (reactions are the SFD starting values).
  5. Size the support: bearing stress, padstone, bolt/weld group, foundation pressure.
  6. File: keep the input → reaction → SFD/BMD → support chain on one page.

6 · Field traps (where reactions go wrong)

  • • Forgetting self-weight: a 300×600 concrete beam weighs 4.5 kN/m — on 6 m that is 13.5 kN per support.
  • • Assuming fixity: a “fixed” sketch with two bolts is a pin. Model what you detail.
  • • Ignoring uplift: overhang + wind can reverse a bearing — light roofs lift off.
  • • Mixing factored/service: never compare a factored reaction against an allowable soil pressure.
  • • Point load at the wrong station: 0.5 m error on a 10 kN load swings reactions by P·Δa/L.

7 · The 3-check rule (sign-off standard)

  1. Math check: ΣFy and ΣM both close to zero with project units printed.
  2. Sanity check: reactions sum to total load; heavier side sits under heavier load; UDL symmetry gives Ra ≈ Rb.
  3. Load-path check: every reaction lands on something sized for it — beam → seat → column → footing → soil, no floating numbers.

Practical Tips

  • •Split dead vs live early — factoring depends on it
  • •Include self-weight; concrete often dominates
  • •Report service values to 1 decimal for bearings and footings

Common Mistakes

Service load checked against factored capacity
Keep a service column (settlement, soil, deflection) and a factored column (strength) side by side.
Self-weight omitted
Add member weight into the total first.
Wrong units in one term
Convert everything to the page unit system before combining terms.

Assumptions

This calculator makes the following assumptions to provide estimates:

Static gravity loading: No impact, vibration or seismic amplification unless the page applies one.
Nominal material properties: Code-grade materials per project data; confirm lightweight or high-strength cases.
Scheme-level accuracy: Closed-form code clauses for preliminary and check calculations.

Limitations

Be aware of these limitations when using this calculator:

Verify supports and pattern: Pattern loading, continuity and support settlement need their own runs.
Confirm local code values: Loads, factors and minimums vary by jurisdiction.

Frequently Asked Questions

Answers to common questions about this calculator.

What slope is safe?
Follow the geotechnical report and local rules; 1H:1V or flatter is common in loose ground, steeper only if supported.
Is working space included?
No, enlarge the base for formwork, drainage and access before computing.
What about overbreak?
Add 5 to 10% overbreak plus bulking for loose truck measure.
Shored or vertical cuts?
Set slope to 0 for sheeted pits and design the support separately.
How do I find reactions for a simply supported beam?
Take moments about the left support: Rb = (P·a + w·L·L/2) / L, then Ra = P + w·L − Rb. Always re-check by taking moments about the right support — the residual must be ≈ 0.
What does a negative (downward) reaction mean?
The support must pull DOWN instead of pushing up — net uplift from overhangs, pattern loading or wind. Provide a hold-down strap, anchor or ballast; a gravity-only bearing will lift off.
Do I include the beam self-weight?
Yes, always. A 300×600 mm concrete beam weighs ~4.5 kN/m — on a 6 m span that adds ~13.5 kN per support. Bundle it into the UDL before solving.
Service vs factored loads — which do I report?
Report BOTH in separate columns: service (unfactored D+L) for deflection, bearing, settlement and soil checks; factored LRFD (1.2D + 1.6L) for member strength. Never compare a factored reaction with an allowable soil pressure.
What is the difference between a UDL and a UVL?
A UDL (uniformly distributed load) is constant intensity over a length (kN/m). A UVL (uniformly varying / triangular) runs zero-to-max — e.g. soil or hydrostatic pressure. They integrate differently, so use the matching calculator.
How do I turn a floor area load into a beam line load?
Multiply the area load (kN/m²) by the tributary width (m) draining to the beam: line load = area load × tributary width. Add the beam self-weight, partitions and finishes first.
What is tributary area?
The floor/roof area whose load flows to one member — bounded by halfway lines to adjacent members. Tributary area × area load = the point/line load that member must carry.
Which load combination usually governs a beam?
For strength: 1.2D + 1.6L (+ 0.5 for roof live/snow/rain) per ASCE 7 LRFD. Service D+L governs deflection and bearings; 0.9D + 1.0W governs uplift and overturning.
LRFD vs ASD — does it change the reactions?
No — equilibrium is the same. The design PHILOSOPHY differs: LRFD factors loads up (1.2D+1.6L) against factored resistance (ϕRn); ASD keeps service loads against allowable stresses (Rn/Ω). Keep the two systems in separate columns.
Pin, roller or fixed — how do I choose the support model?
Model what you DETAIL. Masonry/steel seats and two-bolt end plates are pins (moment released); moment frames, welded rigid joints and well-anchored cantilevers earn fixity. When in doubt, the pinned assumption is conservative for midspan moment but NOT for uplift.
What deflection limits apply to beams?
Typical code limits: live-load deflection L/360 for floors (L/240 roofs), total-load L/240, cantilevers 2L/360-ish per IBC Table 1604.3. Always check under SERVICE loads with the correct (cracked, long-term) stiffness.
How do I convert kN ↔ kips and m ↔ ft?
1 kN = 0.2248 kips (1 kip = 4.448 kN); 1 m = 3.2808 ft. Moments: 1 kN·m = 0.7376 kip·ft. Every calculator on this site has an SI/Imperial toggle that converts all displayed values.
Shear vs bending moment — which sizes what?
Shear sizes stirrups/webs and connections (V ≤ ϕVn); bending moment sizes flexural steel and the section (M ≤ ϕMn via section modulus S: stress = M/S). Deflection is governed by stiffness EI, a third independent check.
Where does the maximum moment occur?
Where shear crosses zero: under a midspan point load, or at x = R/w under UDL (span moment = R·x − w·x²/2). On continuous beams also check the hogging peaks OVER interior supports — they often govern.
What is section modulus and how do I use it?
S = I/c (mm³): the geometric bending efficiency of a section. Bending stress = M/S; required S = factored moment / allowable (or design) stress. Compare against the standard-section table on each page.
How do I quickly check a steel beam?
Three checks per AISC 360: bending (Ch. F incl. lateral-torsional buckling over the unbraced length), shear (Ch. G), and deflection (L/360). Then verify the connection develops the end reaction.
How do I quickly check a concrete beam?
Flexure per ACI 318: ϕMn = ϕ·As·fy·(d − a/2) with ϕ = 0.9 (tension-controlled); one-way shear Vc + Vs (Ch. 22); deflection via minimum thickness or direct computation with cracked stiffness and long-term multiplier.
What is development length and why does it matter?
The embedment needed for a bar to reach yield (ld, ACI 318 Ch. 25). A perfectly computed moment capacity is worthless if the bar pulls out — extend bars past inflection points and hook or develop them at supports.

Related Calculators

Explore more calculators related to this topic.

Glossary

Technical terms used in mortgage calculations explained in plain language.

Reaction
Force (or moment) a support exerts on a member to maintain static equilibrium (ΣF = 0, ΣM = 0).
Simply supported
Beam on one pin + one roller. Resists vertical load; allows rotation and (at roller) horizontal movement.
Fixed support
Clamped end resisting force AND moment; prevents rotation. Used in cantilevers and fixed frames.
UDL / UVL
Uniformly distributed load (constant kN/m) vs. uniformly varying load (triangular, zero-to-max).
Tributary area
Floor/roof area whose load drains to one member. Line load = area load × tributary width.
Factored load
Service load × LRFD load factor (e.g. 1.2D + 1.6L) for strength design per ASCE 7.
Serviceability
Deflection, cracking and vibration limits under day-to-day (unfactored) loads.
Uplift
Net downward-hold requirement: a negative (downward-pulling) reaction, common on overhangs.

Authoritative References

Trusted sources and standards referenced by this calculator.

Applicable Standards

ACI 318 — Building Code Requirements for Structural ConcreteAISC 360 — Specification for Structural Steel BuildingsASCE 7 — Minimum Design Loads and Associated CriteriaEurocode 2 (EN 1992) — Design of Concrete StructuresEurocode 3 (EN 1993) — Design of Steel StructuresIBC — International Building Code (structural chapters 16–23)