Progress Billing Calculator
Progress invoice from contract value, measured completion, prior billings and retainage — this draw with earned and held lines.
Calculator
Quick presets
Agreed total
Measured progress
Paid to date
Held per app
Diagram
Sketch for progress billing calculator with your values. Not to scale — verify on site before ordering.Plan
| Item | Value |
|---|---|
| This invoiceHeadline this invoice | 39,000.00 $ |
| EarnedSupporting figure | 210,000.00 $ |
| RetainageSupporting figure | 21,000.00 $ |
| Priced value (enter a unit price)Materials before labor + contingency | $39,000.00 |
Cost plan
| Materials | $39,000.00 |
| Labor and install | $0.00 |
| Contingency | $0.00 |
| Project total | $39,000.00 |
Estimates only — get 2–3 local quotes. Labor varies by region.
Comparisons
| No retainage | 60,000.00 |
| Earned check | 210,000.00 |
| Double contract | 78,000.00 |
Results
This invoice
39,000.00$
From invoice = contract × % − prior − retainage
210,000.00$
Supporting conversion
21,000.00$
Supporting conversion
$39,000.00
Estimated total
Live results update as you type — currently showing 39,000.00 $ for progress billing calculator. Replace the defaults with your own values for an exact takeoff.
Visualizations
Your invoice vs phases ($)
Project cost split
Formula
Progress invoice from contract value, measured completion, prior billings and retainage — this draw with earned and held lines.
Alternative Form
Variables
| Symbol | Name | Unit | Description |
|---|---|---|---|
| V1 | Contract | $ | Agreed total |
| V2 | Complete | % | Measured progress |
| V3 | Prior billings | $ | Paid to date |
| V4 | Retainage | % | Held per app |
| Q | Result | $ | Headline answer at full precision. |
Explanation
Inputs convert to consistent units first, the formula runs at full precision, then waste and rounding produce the order figure. Cost multiplies by your unit price.
Step-by-Step Calculation
Follow each step to understand how the result is calculated from your inputs.
Earned to date = contract x % complete.
This draw = earned minus prior billings minus retainage.
Worked Examples
See how the calculator works with different scenarios.
Scenario
The live inputs above run through the full path below — not just the headline answer.
Inputs
Calculation
1. Earned to date = contract x % complete. → 210,000.00 2. This draw = earned minus prior billings minus retainage. → 39,000.00
Result
39,000.00 $
Interpretation
Order the uplifted figure, never the net: cuts, defects, rounding and code minimums consume the allowance.
Understanding Your Result
Your Result: This invoice: 39,000.00 $
Typical range: See the comparisons table below for everyday benchmarks.
What This Means
Your result is 39,000.00 $ (this invoice). That is the engineered figure — verify it against the code table before buying.
Why It Matters
Sizing drives budget, schedule, deliveries and inspections. Small input errors compound across runs, so modelling before buying is the cheapest due diligence.
Professional Interpretation
Plan around 210,000.00 $ (earned), about $39,000.00 at your unit price. Keep same-lot spares for repairs.
How this is calculated
invoice = contract × % − prior − retainage. Progress invoice from contract value, measured completion, prior billings and retainage — this draw with earned and held lines.
What drives the result
Input size, the selected option, waste % and whole-unit rounding. Unit price never changes quantity — only cost.
Recommendations
- •Split irregular scopes into measurable runs and add the sections.
- •Add waste before ordering: x1.10 straight, x1.15 cut-up, x1.20 complex.
- •Measure twice — lasers beat tapes past 20 ft; photograph nameplates.
- •Keep spares: lots, dye and grain shift between batches.
Educational Content
Introduction
Progress invoice from contract value, measured completion, prior billings and retainage — this draw with earned and held lines.
Concept Explanation
Every calculation reduces to invoice = contract × % − prior − retainage, evaluated at full precision after unit conversion. The Steps section shows each substitution so the path is auditable.
Applications
Benefits
- •One live calculation — no separate tools per size or material
- •Steps show every substitution for bid backup
- •Waste and rounding separated from net math
- •Instant cost, charts and lists from the same numbers
Limitations
- •Planning math only — it does not replace stamped design where required
- •Allowances use national planning rates; confirm local stock and prices
- •Irregular geometry should be split into measurable sections
Best Practices
- •Confirm nameplate and table values before ordering
- •Keep one unit per field; watch the steps for conversions
- •Photograph measurements and labels for dispute-proof records
- •Add the trade waste factor before ordering, not after
Common Misconceptions
Practical Tips
- •Run one calculation per run, room or phase, then add the order lines.
- •Pick stock sizes that divide your runs evenly to cut waste several points.
- •Photograph each measurement next to the tape for bid backup.
- •Enter your actual unit price to turn the takeoff into a budget in one step.
Common Mistakes
Assumptions
This calculator makes the following assumptions to provide estimates:
Limitations
Be aware of these limitations when using this calculator:
Frequently Asked Questions
Answers to common questions about this calculator.
What does the Progress Billing Calculator do?
What is the formula behind the Progress Billing Calculator?
What inputs does the Progress Billing Calculator need?
What units does the Progress Billing Calculator report?
How accurate is the Progress Billing Calculator?
Can you walk through an example with the Progress Billing Calculator?
Which code or standard governs the Progress Billing Calculator?
How does the Progress Billing Calculator price the job?
What is the most common mistake with the Progress Billing Calculator?
When should I hire a pro instead of trusting the Progress Billing Calculator?
What is the difference between markup and margin in the Progress Billing Calculator?
How much overhead per the Progress Billing Calculator?
How do labor costs build in the Progress Billing Calculator?
How do I build a unit price in the Progress Billing Calculator?
How do equipment costs work in the Progress Billing Calculator?
How do subcontractor costs work in the Progress Billing Calculator?
What should my hourly rate be per the Progress Billing Calculator?
How do change orders price in the Progress Billing Calculator?
How does retainage work in the Progress Billing Calculator?
How do progress billings work in the Progress Billing Calculator?
How do deposits work in the Progress Billing Calculator?
How do I forecast job cost in the Progress Billing Calculator?
What is break-even per the Progress Billing Calculator?
How do I compare bids in the Progress Billing Calculator?
How much contingency per the Progress Billing Calculator?
How do I handle cost variance in the Progress Billing Calculator?
What does insurance cost per the Progress Billing Calculator?
What do permits cost per the Progress Billing Calculator?
How do I verify the Progress Billing Calculator by hand?
What is the biggest costing mistake the Progress Billing Calculator prevents?
When should I hire a pro per the Progress Billing Calculator?
How do I document the Progress Billing Calculator for a bid or lender?
Related Calculators
Explore more calculators related to this topic.
Related Guides
Deepen your understanding with these educational resources.
Glossary
Technical terms used in mortgage calculations explained in plain language.
- This invoice
- Headline result of this calculator, reported in $.
- Net vs order quantity
- Net is pure math before waste; order adds waste %, coverage and whole-unit rounding.
- Waste factor
- Uplift for cuts, offcuts, defects and rework — typically 10% straight runs, 15% cut-up, 20% complex.
- Markup vs margin
- Markup = profit/cost; margin = profit/price. 20% markup = 16.7% margin.
- Burdened rate
- Base wage x 1.25-1.4 covering taxes, insurance and benefits.
- Takeoff
- Measured quantities from plans feeding the estimate.
- Retainage
- Held-back share (5-10%) released at substantial completion.
- Break-even
- Revenue covering fixed overhead at the current variable-cost ratio.
Authoritative References
Trusted sources and standards referenced by this calculator.
Applicable Standards
Was This Calculator Helpful?
Page Information
2026-09-24
2.0.0
Free to use for educational and professional purposes.