Slope Fill Calculator
Free slope fill calculator — calculate slope fill volume on H:V slopes with swell, loads and cost. Includes live results, step-by-step working, charts, material takeoff and cost estimates. No sign-up.
Calculator
Along the slope toe
Vertical
Horizontal per 1 vertical
Blank to skip
Slope plan
| Item | Amount |
|---|---|
| Slope volumeBank yards | 133.33 cu yd |
| LooseHaul this | 166.67 cu yd |
| Haul loadsAt 14 cu yd each | 11.9 |
How to use this result
- Primary result: 133.33 cu yd — verify it against a rough hand check before ordering.
- Read the steps section to see every conversion and the exact formula path.
- Use the breakdown table on the left as your order or bid checklist.
- Re-run with worst-case dimensions so the plan covers the whole job.
Results
Slope volume
133.33cu yd
Bank yards
166.67cu yd
With swell
11.9loads
At 14 cu yd each
Live results update as you type — currently showing 133.33 cu yd. Replace the defaults with your own measurements for exact results.
Visualizations
Bank vs loose (cu yd)
Bank vs swell
Formula
Slope volume is the triangular section extruded along its length.
Variables
| Symbol | Name | Unit | Description |
|---|---|---|---|
| H, S | Height, ratio | ft, H:V | Section legs. |
| L | Length | ft | Toe length. |
| V | Volume | cu yd | Bank yards. |
Explanation
Half-height-times-run section at full precision times length over 27; swell sizes haul.
Step-by-Step Calculation
Follow each step to understand how the result is calculated from your inputs.
Triangular cross-section (H:V slope).
Extrude along the length.
Worked Examples
See how the calculator works with different scenarios.
Scenario
The calculation run on the values above, showing the full path rather than only the answer.
Inputs
Calculation
1. Triangular cross-section (H:V slope). → 36.0 sq ft section 2. Extrude along the length. → 133.33 bank · 166.67 loose
Result
133.33 cu yd
Interpretation
Probe every pad and trench, separate topsoil from spoil, and book trucks to the loose volume — not the bank figure.
Understanding Your Result
Your Result: Slope volume: 133.33 cu yd
Typical range: Pickup ~2 cu yd · dump truck 10–16 loose cu yd · trench 1 ft × 100 ft × 4 ft ≈ 15 bank cu yd.
What This Means
Your result is 133.33 cu yd — the bank and loose volumes, truckloads and cost for your slope fill
Why It Matters
Earthwork is the first money spent and the easiest to misjudge: swell multiplies spoil, haul distances multiply cost, and rock stops everything. Quantities first keeps the site moving.
Professional Interpretation
Probe every pad and trench, separate topsoil from spoil, and book trucks to the loose volume — not the bank figure.
How this is calculated
Volume is ½ × height × (height × ratio) × length ÷ 27. Soil factors apply last; trucks round up.
What drives the result
The inputs in a single consistent unit and the allowance or price you apply.
Recommendations
- •Verify critical dimensions on site before ordering.
- •Keep one unit throughout each calculation.
- •Add the trade allowance before buying, not after.
- •Attach the step-by-step working to bids and records.
Educational Content
Introduction
Earthwork quantity is geometry with soil factors: bank volume from dimensions, loose with swell, compacted with shrinkage, trucks from payload.
Concept Explanation
Volume is ½ × height × (height × ratio) × length ÷ 27. Soil factors apply last; trucks round up.
Applications
Benefits
- •Bank, loose and compacted figures together
- •Swell and compaction factors built in
- •Truckloads rounded up for scheduling
- •Free, no sign-up, works on site from a phone
Limitations
- •Two-dimensional math unless stated otherwise — slopes and curves need the right tool
- •Results are only as good as the site measurements
- •Allowances and prices are estimates — confirm with local quotes
Best Practices
- •Measure twice and write measurements down before typing them in
- •Keep one unit throughout each calculation
- •Photograph the tape on large or disputed measurements
- •Re-run with worst-case numbers so the plan covers the whole job
Common Misconceptions
Practical Tips
- •Enter full measurements and let the tool round at the end.
- •Use the steps section to double-check the formula path.
- •Save or share the result link with the crew and the supplier.
- •Re-run with worst-case dimensions for a safe order.
Common Mistakes
Assumptions
This calculator makes the following assumptions to provide estimates:
Limitations
Be aware of these limitations when using this calculator:
Frequently Asked Questions
Answers to common questions about this calculator.
How do I calculate slope fill volume?
What slope ratio is stable?
Bank vs loose yards — what is the difference?
How accurate is this calculator?
What does the cost estimate include?
When do I need shoring or sloping?
How do I balance cut and fill?
What is shrinkage vs swell?
How do I estimate grading production?
What slope ratio is stable for fills?
How do I set grade stakes?
How much does fill shrink when compacted?
How many lifts does an embankment need?
What is optimum moisture for compaction?
How do I measure a stockpile?
How much clearing debris per acre?
What permits does earthwork need?
How do I control erosion during earthwork?
How do I measure correctly for the slope fill calculator?
What units does the slope fill calculator use?
How accurate is the slope fill calculator?
Can I use the slope fill calculator for bids and quotes?
Should I add waste or contingency to the result?
Why is my result different from my supplier quote?
Do I need a professional for this work?
How do I convert the result to other units?
What mistakes do beginners make with the slope fill calculator?
Can I share the slope fill calculator result with my crew or supplier?
Does the slope fill calculator work on a phone at the job site?
How often should I re-run the slope fill calculator?
Related Calculators
Explore more calculators related to this topic.
Related Guides
Deepen your understanding with these educational resources.
Bank vs loose yards, swell, and truck planning.
Step-by-step slope fill calculator examples with real job-site numbers.
Reference tables, waste factors and coverage rates for excavation, earthwork & grading.
Glossary
Technical terms used in mortgage calculations explained in plain language.
- Bank cubic yard
- One cubic yard of undisturbed in-place material.
- Loose cubic yard
- Excavated material after swell — typically 20–35% more than bank.
- Swell
- Volume growth when soil is dug (20–35% for most soils, up to 50%+ for rock).
- Compaction
- Mechanical densification of placed fill, usually in 8–12 in lifts.
- Cut / fill
- Ground removed (cut) or placed (fill) to reach design grade.
- Spoil
- Excavated material not reused as fill.
- cu yd
- The primary unit reported by this calculator.
Authoritative References
Trusted sources and standards referenced by this calculator.
Applicable Standards
Was This Calculator Helpful?
Page Information
2026-09-23
2.0.0
Free to use for educational and professional purposes.