2026-09-23 8 min read

Strip Footing Calculator

Free strip footing calculator — calculate strip footing concrete, rebar, excavation and cost. Includes live results, step-by-step working, charts, material takeoff and cost estimates. No sign-up.

Calculator

Footing length(ft) Help
ft

Total run

Footing width(in)
in
Footing depth(in)
in
Rebar bars(bars) Help
bars

Continuous longitudinal bars

Waste allowance(%) Help
%

Over-excavation and spillage

Price (optional)($/cu yd) Help
$/cu yd

Blank to skip

Bar size

Footing plan

ItemAmount
ConcreteNet + waste — order this3.567 cu yd
Rebar126 ft with laps84 lb
ExcavationWith working room8.33 cu yd

How to use this result

  • Primary result: 3.57 cu yd — verify it against a rough hand check before ordering.
  • Read the steps section to see every conversion and the exact formula path.
  • Use the breakdown table on the left as your order or bid checklist.
  • Re-run with worst-case dimensions so the plan covers the whole job.

Results

Optimal

Concrete to order

3.567cu yd

Net plus waste

Rebar

84lb

126 ft with 5% laps

Excavation

8.33cu yd

With working room

Live results update as you type — currently showing 3.57 cu yd. Replace the defaults with your own measurements for exact results.

Visualizations

Concrete vs dig (cu yd)

3.6Concrete
8.3Dig

Net vs waste

Net93%
Waste7%

Formula

Strip footing concrete is run length times cross-section divided by 27; excavation adds working room.

V = L × W × D ÷ 27

Variables

SymbolNameUnitDescription
VConcretecu ydFooting volume with waste.
L, W, DDimensionsftWidth and depth convert from inches.
rebarSteellbBars × length with laps.

Explanation

Cross-section times run at full precision, waste for the order, excavation with working room, rebar with lap allowance.

Step-by-Step Calculation

Follow each step to understand how the result is calculated from your inputs.

Step 1

Footing concrete in cubic yards.

60 × 1.50 × 1.00 ÷ 27
Result: Net = 3.333 cu yd
Step 2

Order with 7% waste; excavation allows 6 in each side and depth.

3.333 × 1.07
Result: Order = 3.567 cu yd · dig ≈ 8.33 cu yd
Final Answer
3.567

Worked Examples

See how the calculator works with different scenarios.

Scenario

The calculation run on the values above, showing the full path rather than only the answer.

Inputs

Result:3.57 cu yd

Calculation

1. Footing concrete in cubic yards. → Net = 3.333 cu yd 2. Order with 7% waste; excavation allows 6 in each side and depth. → Order = 3.567 cu yd · dig ≈ 8.33 cu yd

Result

3.57 cu yd

Interpretation

Confirm bearing soil and frost depth, hold inspections before pouring, and keep 5–10% concrete waste in every order.

Understanding Your Result

Your Result: Concrete to order: 3.567 cu yd

Typical range: Strip footing ~1–2 cu yd per 10 ft · pier 12 in × 4 ft ~0.13 cu yd · basement wall 40 ft ~10 cu yd.

What This Means

Your result is 3.57 cu yd — the concrete, excavation, rebar and cost for your strip footing

Why It Matters

Foundations carry everything and forgive nothing: undersized footings settle, missing rebar cracks, and wet concrete waits for no one. Quantities first keeps the pour boring.

Professional Interpretation

Confirm bearing soil and frost depth, hold inspections before pouring, and keep 5–10% concrete waste in every order.

How this is calculated

Volume is length × width-in-feet × depth-in-feet ÷ 27. Waste and rounding apply last.

What drives the result

The inputs in a single consistent unit and the allowance or price you apply.

Recommendations

  • •Verify critical dimensions on site before ordering.
  • •Keep one unit throughout each calculation.
  • •Add the trade allowance before buying, not after.
  • •Attach the step-by-step working to bids and records.

Educational Content

Introduction

Foundation quantity is geometry: lengths × cross-sections for concrete, perimeter × depth for excavation, bar counts × lengths for rebar.

Concept Explanation

Volume is length × width-in-feet × depth-in-feet ÷ 27. Waste and rounding apply last.

Applications

▸Strip, pad and pier footing takeoffs
▸Foundation wall and slab concrete
▸Excavation, backfill and gravel quantities
▸Rebar, formwork and drainage counts
▸Foundation cost estimates with waste

Benefits

  • •Concrete, dig, steel and cost from one input set
  • •Inspection-ready step-by-step working
  • •Waste and rounding built into order rows
  • •Free, no sign-up, works on site from a phone

Limitations

  • •Two-dimensional math unless stated otherwise — slopes and curves need the right tool
  • •Results are only as good as the site measurements
  • •Allowances and prices are estimates — confirm with local quotes

Best Practices

  • •Measure twice and write measurements down before typing them in
  • •Keep one unit throughout each calculation
  • •Photograph the tape on large or disputed measurements
  • •Re-run with worst-case numbers so the plan covers the whole job

Common Misconceptions

Myth: The calculator replaces site verification.
Truth: It replaces the arithmetic, not the tape measure — always verify before ordering.
Myth: One decimal place is always enough.
Truth: On long runs, rounding early compounds. Enter full measurements and let the tool round at the end.
Myth: Metric and imperial give different answers.
Truth: They are the same physical quantity in different units — conversion is exact.

Practical Tips

  • •Enter full measurements and let the tool round at the end.
  • •Use the steps section to double-check the formula path.
  • •Save or share the result link with the crew and the supplier.
  • •Re-run with worst-case dimensions for a safe order.

Common Mistakes

Rounding measurements before calculating.
Enter the full tape reading; rounding early compounds across a job.
Mixing units between fields.
Pick one unit in the dropdown so every conversion is consistent.
Forgetting to verify on site.
Plans differ from as-built work — confirm critical dimensions.
Ordering the bare result with no allowance.
Add the trade waste or contingency factor before buying.

Assumptions

This calculator makes the following assumptions to provide estimates:

Consistent units: All inputs share the selected unit system.
Standard geometry: Flat-plane Euclidean formulas unless stated.
Full precision: Rounding happens only on display, never mid-calculation.

Limitations

Be aware of these limitations when using this calculator:

Estimates, not quotes: Allowances and unit prices vary by region — get 2–3 local quotes.
Verify on site: Confirm critical dimensions before ordering or cutting.

Frequently Asked Questions

Answers to common questions about this calculator.

How do I size a strip footing?
Width follows bearing capacity and wall load, depth follows frost line and drawings — this tool quantities the chosen size: length × width × depth ÷ 27.
How much rebar goes in a footing?
Typically two or more continuous bars with corner laps; the bar count and size inputs total the footage with 5% for laps.
How accurate is this calculator?
Exact for the dimensions entered. Soil capacity, frost depth and water table govern the design — verify with the drawings and the inspector.
What does the cost estimate include?
Concrete and listed materials at your prices on the order quantities. Excavation, labor, pumping and inspections add per the cost rows.
Do I need an engineer?
Standard house footings follow prescriptive IRC tables; anything unusual — poor soils, slopes, deep fills, tall walls — needs engineering.
When can footings be poured?
After the excavation passes inspection: correct depth, clean undisturbed bearing, setbacks held and forms/rebar approved.
How wide and deep should a footing be?
Width follows bearing capacity and wall load, depth follows frost line and drawings — this tool quantities the chosen size. Never guess structural sizes.
How do footings reach below frost?
Excavate to local frost depth (12 in in warm zones, 48 in+ in cold ones) and bear on undisturbed soil. The inspector checks depth before concrete.
How do I lap and corner rebar?
Overlap 24–30 in for #4 (more for bigger bars), wire every splice, stagger laps so joints do not align, and bend corners continuous instead of butting.
What concrete strength for footings?
Usually 2,500–3,000 psi minimum per code and drawings, air-entrained where freeze-thaw reaches. Strength is specified on the plans.
How much digging is a footing really?
Roughly 1.5–2 times neat volume with working room each side and depth. Spoil swells ~25% loose — plan the pile before the excavator arrives.
What is undisturbed bearing soil?
Soil never excavated, filled or softened — footings bear only on it (or engineered fill). Mushy bottoms get over-excavated and replaced, then inspected.
Do footings need formwork both sides?
Neat cuts in firm soil can pour against earth; anything over-dug or shallow needs both faces formed. Forms also hold line and level.
How do piers differ from pad footings?
Piers are deep round shafts for point loads and frost bypass; pads are shallow square spreads. Both math out as volume, but construction differs completely.
What is a grade beam vs a strip footing?
Strip footings spread wall loads to soil; grade beams span between piles or pads carrying walls across weak ground. Different structures, similar concrete math.
How do I keep a footing pour continuous?
Stage trucks 15–20 minutes apart, vibrate into the previous face, and never let concrete sit past initial set. Small footings should pour in one go.
Does the strip footing calculator work on a phone at the job site?
Yes — every page is mobile-friendly with no sign-up. Bookmark the tools you use daily for one-tap takeoffs.
How often should I re-run the strip footing calculator?
Re-run whenever dimensions change, prices move, or you switch materials. Early estimates, pre-order checks and final buy quantities each deserve a fresh run.
What should I check before ordering materials?
Dimensions verified on site, correct unit, waste allowance added, pack sizes and minimums confirmed, delivery access and schedule agreed. The breakdown table is your checklist.
Where do I find the formula behind the strip footing calculator?
In the formula section below the results, with every variable defined, plus a worked example tracing your own inputs step by step.
How do I read the steps section on the strip footing calculator page?
Each numbered step shows the inputs used, the formula applied and the intermediate result, ending in the headline figure. Follow it top to bottom to audit the math.
What if my site conditions differ from the page defaults?
Defaults are worked examples, not recommendations — replace every input with your own measurements, prices and allowances before ordering or bidding.
How do I budget for price changes mid-project?
Lock supplier quotes in writing with expiry dates, carry a 5–10% escalation contingency, and re-run the calculator when prices move. Volatile materials get shorter quote windows.
Should I buy materials in bulk for this job?
Bulk wins when storage is dry and secure, the material keeps, and the discount beats carrying cost. Otherwise phased delivery avoids damage, theft and cash lockup.
How do I document quantities for change orders?
Record before-and-after measurements with dated photos, keep delivery tickets, and re-run the calculator for the changed scope. Paper trails get paid; memories do not.
What inspections relate to the strip footing calculator?
Anything structural, concealed or regulated gets inspected before covering: footings, steel, drains, waterproofing and rough-ins. Book inspections before the work that buries them.
How do I measure correctly for the strip footing calculator?
Measure twice with a tape or laser, write every reading down before typing it in, and keep one unit throughout. Photos of the tape protect you on disputed dimensions.
What units does the strip footing calculator use?
Whatever unit you select — pick one and use it for every field so conversions stay consistent. Results convert to the common trade units automatically.
How accurate is the strip footing calculator?
Exact for the numbers entered: all math runs at full precision and rounds only for display. Field accuracy depends on your measurements, so verify critical dimensions on site.
Can I use the strip footing calculator for bids and quotes?
Yes — the steps section shows the full working, and the breakdown table lists order quantities. Attach both to bids so clients see net figures and allowances separately.

Related Calculators

Explore more calculators related to this topic.

Related Guides

Deepen your understanding with these educational resources.

Glossary

Technical terms used in mortgage calculations explained in plain language.

Footing
Widened base that spreads wall or column loads to the soil.
Bearing capacity
Soil pressure limit, e.g. 1,500–4,000 psf for typical soils.
Rebar
Deformed steel bars; #4 is 1/2 in, #5 is 5/8 in diameter.
Frost line
Depth below which soil does not freeze — footings must bear below it.
Backfill
Soil replaced around the foundation after inspection.
Waterproofing
Membrane or coating keeping foundation walls dry.
cu yd
The primary unit reported by this calculator.

Authoritative References

Trusted sources and standards referenced by this calculator.

Applicable Standards

IRC Chapter 4: footing sizes, depths and reinforcement minimumsFootings bear on undisturbed soil below the local frost lineConcrete 5–10% waste; rebar laps per ACI 318 development lengthsInspect footings before pouring — no inspection, no concrete

Was This Calculator Helpful?

Page Information

Last Updated:

2026-09-23

Version:

2.0.0

License:

Free to use for educational and professional purposes.